Indiramma
Govt.Schemes
S.No Description 2006-07(Phase 1)
Selected Wards 12 No.s
2007-08(Phase 2)
Selected Wards 12 No.s
Target Achivement Target Achivement
1 Tap Connection(Gen) 443 443 350 350
2 Tap Connections (Rs.1200) 70 70 120 120
3 Toilets in Schools 10 10 6 6
4 Electric Poles 204 194 5 5
5 Length of Drains
desilted(mts)
1000 1000 850 850
6 Length of Drains
Repaired(mts)
228 228 202 202
7 Pensions
A) OAP
442 706 442 Total
706
426 904 426 Total
904
B) WP 179 179 396 396
C) Weavers Pensions -- -- -- --
D) Disabled Pensions 85 85 82 82
8 Housing 4087 4087 works
grounded
4555 4555
Important Documents
S.No. Description Type
1. Indiramma Housing MIS Report for January 2009 View/Download
2. Indiramma Housing MIS Report for December 2008 View/Download
3. Indiramma Housing MIS Report for November 2008 View/Download
4. Indiramma Housing MIS Report for October 2008 View/Download
5. Indiramma Housing MIS Report for September 2008 View/Download